Transheat

Transheat scope

Fatigue analysis due to cyclic service conditons for two pressure vessels – one mounted on top of another with the bottom vessel supported on spring hangers and no rigid foundation.
Installation in : Saudi Arabia
All design documents reviewed by : JGC, Japan.

Major design attributes

Suggested minimum required thickness for some components of the system to ensure that the above requirements are met.
Scroll to Top